HousingSurvey Pro Logo
HousingSurveyPRO™

Damp and mould case management software for social landlords.

A damp and mould case is more than an inspection. Someone reports it, someone triages it, a surveyor investigates, the resident gets a written summary, works are ordered and done, and someone checks the hazard has gone. When the case is reviewed later, by your own managers, the Housing Ombudsman or a court, each of those steps needs a date and a record behind it.

HousingSurvey Pro keeps all of it on one case: the statutory clock for the nation the home is in, the resident's details and letters, the works orders, and the sealed, tamper-evident field evidence. It is built for housing associations, councils and the contractors who work for them, and it works alongside your housing management system rather than replacing it.

How a case moves, and what each step records

Every case shows the same eight-stage rail, with a single Next step action that moves it on. Stages that never applied, such as the survey on a works-only job, are shown struck through rather than as if they happened.

  1. Raised. From New survey in the portal, or from your housing system through the REST API. You record the property (by UPRN where you hold one), the hazard type, the severity and the day you were told about the hazard or otherwise became aware of it, plus the time for an emergency. That date starts the clock, not the day someone opens the record.
  2. Survey scheduled. Assign the survey to one of your own surveyors or send it to a contractor organisation. It appears in the assignee's field-app inbox with its due date and on the Schedule calendar, and once it has a time, in their personal calendar feed. A resident letter card is ready for the appointment.
  3. Surveyed. The surveyor captures the inspection in the field app, offline if need be: room-by-room readings and photos, the hazard triage (significant or emergency), any emergency make-safe actions and, for most hazard types, the HHSRS score. Finalising seals the record and records the investigation as concluded, which re-anchors the written-summary and works deadlines to the real date.
  4. Summary provided. Send the written summary from the case: start from a template, or from an AI draft if your organisation has connected an AI provider, and edit it freely before it goes. If it went another way, mark it as provided externally with a note, and the case says so.
  5. Works scheduled. Raise a works order from the survey's findings, with their photos carried across. The scope of works is priced from your own schedule of rates. Dispatch it to your operatives or to a contractor.
  6. Works complete. The operative completes the job in the field app with at least one fingerprinted after-photo and a GPS fix. A completion recorded from the office on their behalf is always labelled as such and claims no location.
  7. Verified. Schedule a verifying re-survey and mark the works verified against it once it is sealed, or verify by attestation with a written reason. The two are labelled differently on the record and in every report.
  8. Closed. Close with the reason that applies: verified, no works needed, or closed without verification, which always shows amber. Decant and wash-down needs can be recorded at any point while the case is open.

Real cases don't always follow the tidy path, so the weaker alternatives are allowed but always labelled: Summary Provided Externally, Notes Only — No Photo Evidence, No GPS fix recorded, Verified By Attestation — No Re-Survey. Each label stays on the record and in its reports. See the case lifecycle end to end.

HousingSurvey Pro work orders board in the management portal, filtered to overdue cases showing Awaab's Law statutory deadlines and breach status per work order

The statutory clock, for the nation the home is in

Deadlines are worked out once, on our servers, when the case is raised. Each case follows the nation set on its property, or your organisation's default, and that nation is copied onto the case so a running clock never moves.

Statutory clocks HousingSurvey Pro counts, by nation
NationRules countedTimescales
EnglandAwaab's Law, Phase 1 (since 27 October 2025): damp and mould, and an emergency of any other hazard type except asbestos, which the Control of Asbestos Regulations 2012 govern insteadInvestigate within 10 working days; written summary within 3 working days and safety works within 5 working days after the investigation. Emergency: 24 hours.
WalesWHQS element 1c, for cases reported on or after 1 April 2026Investigate within 10 working days and remedy within a further 5 (24 hours and a further 24 where imminent harm is assessed); a summary plan within 5 working days after the investigation unless the remedy is recorded in time.
ScotlandDamp and mould timescales for social landlords, for cases reported on or after 6 October 2026Investigate within 10 working days; written summary within 3 and start of repairs within 5 working days after the investigation; repairs completed within 20 working days of starting.
Northern IrelandNo statutory clockNone: set your own due date.

More detail: how the statutory clock works, the Awaab's Law timeline, Wales and Scotland.

Residents: intake, vulnerability triage and letters

The case history you can show later

Your teams, your contractors, one record

The office runs cases from the portal's Dashboard, Jobs, Schedule and Evidence screens, with a Needs attention panel for overdue, unassigned and stalled cases and a follow-up inbox for callbacks and reschedules raised from the field. Surveyors and operatives work from the field app's job list.

Contractor organisations work under scoped grants. A job you send them appears in their own jobs list for their manager to assign; they see only the jobs you send, never your property register or your other contractors, and the records they finalise join your evidence chain for that home. See Awaab's Law software for repairs contractors.

Works alongside your housing management system

HousingSurvey Pro is not a housing management system: rent, tenancy accounts and the rest of your housing management stay where they are. It manages the damp and mould case and its evidence, and exchanges data with the systems you already run. The API, webhooks, EDI, SFTP and Power Automate connector are on the Platform plan and above.

See integrations and the developer documentation.

Security and data

The database, file storage, server functions and reporting warehouse run in Google Cloud's London region; our sub-processors page lists the global services, such as sign-in and push notifications. App Check means only genuine apps reach the data. On the Enterprise plan you bring Microsoft Entra ID single sign-on and SCIM provisioning. The platform is designed against Cyber Essentials and ISO/IEC 27001 controls; formal certification is on the roadmap and not yet held. See security.

What it does not do

It doesn't decide whether a hazard is significant or an emergency, whether works were adequate, or whether you have complied with the law: people make those calls, and the record shows who made them and when. The deadlines are a planning aid. It doesn't calculate private landlords' deadlines in Scotland, and Northern Ireland cases carry no statutory clock.

Related

Frequently asked questions

What does damp and mould case management software do?

It holds each damp and mould case on one record from the first report to closure. In HousingSurvey Pro a case moves through eight stages (raised, survey scheduled, surveyed, summary provided, works scheduled, works complete, verified and closed), with the statutory clock, the resident letters, the works orders and the sealed field evidence attached to the same case.

Does it replace our housing management system?

No. It manages the damp and mould case and its evidence, and works alongside your housing management or case-management system. Cases can come in from your system through the REST API. Finalised records go back by webhook, nightly EDI file or SFTP, and webhooks also announce each recorded stage and each approaching or breached deadline. The API, webhooks, EDI and SFTP are on the Platform plan and above.

Which statutory timescales does it count?

Each case follows the rules for its nation. In England it counts Awaab's Law: investigate within 10 working days, a written summary within 3 working days after the investigation and safety work within 5, or 24 hours for an emergency. In Wales it counts WHQS element 1c for cases reported from 1 April 2026, and in Scotland the damp and mould timescales for social landlords for cases reported from 6 October 2026. Northern Ireland has no statutory clock, so you set your own due date. The dates are a planning aid: the platform does not decide whether you have complied.

Does recording a no-access visit stop the clock?

No. A failed access attempt or a missed or changed appointment is recorded and sealed as evidence of what happened, with its reason and an optional photo, but it does not pause or extend the statutory deadlines.

Can our contractors work cases in it?

Yes. You send a survey or works order to a contractor organisation you have added, and it appears in their own jobs list for their manager to assign. They see only the jobs you send them, and the records they finalise join your evidence chain for the property.

This page is general information, not legal advice. Statutory timescales differ between nations and are being phased in; always confirm the current requirements with your compliance team. Product details reviewed 17 October 2026.